Based on historical Belgrade, NE data, solar panels that are tilted towards the equator at an angle equal to the latitude will produce the maximum solar energy output in Belgrade.[1]
Belgrade has an average monthly Global Horizontal Irradiance (GHI) of 4.28 kilowatt hours per square meter per day (kWh/m2/day), which is approximately 12% less than the average monthly Direct Normal Irradiance (DNI) of 4.84 kWh/m2/day. [1]
Solar installations in Belgrade that are always titled at the latitude of Belgrade (Average Tilt at Latitude or ATaL) average 5.08 kWh/m2/day, or about 19% greater than the average monthly GHI of 4.28 kWh/m2/day and approximately 5% greater than the average monthly DNI of 4.84 kWh/m2/day. [1]
Solar Energy Glossary
Global Horizontal Irradiance (GHI)
Global Horizontal Irradiance: The total amount of solar radiation that is received per unit area by a surface that is always positioned in a horizontal manner.
Direct Normal Irradiance (DNI)
Direct Normal Irradiance: The total amount of solar radiation received per unit area by a surface that is always perpendicular to the sun rays that come in a straight line from the direction of the sun at its current position in the sky.
Average Tilt at Latitude (ATaL)
Average Tilt at Latitude: The total amount of solar radiation received per unit area by a surface that is tilted toward the equator at an angle equal to the current latitude. ATaL will often produce the optimum energy output.
Solar Radiation Levels in Belgrade
Solar Radiation Data in Belgrade, NE
See the chart below for monthly solar radiation levels in Belgrade.
* Amounts listed in kWh/m2/day (kilowatt hours per square meter per day)
Solar Radiation Analysis for Belgrade, NE
Belgrade, NE has a average annual solar radiation value of 5.24 kilowatt hours per square meter per day (kWh/m2/day). [1]
The month with the highest historical solar radition values in Belgrade is July with an average of 6.4 kWh/m2/day, followed by June at 6.3 kWh/m2/day and August at 6.09 kWh/m2/day. [1]
The three months that historically average the lowest average solar radiation levels in Belgrade (Nebraska) are December with an average of 3.64 kWh/m2/day, followed by January with an average of 3.73 kWh/m2/day and November at 4.29 kWh/m2/day. [1]
Solar Power Comparison: Belgrade vs. the U.S.
Solar Power Levels in Belgrade
The average monthly solar radiation level in Belgrade, NE, of 5.24 kilowatt hours per square meter per day (kWh/m2/day) is approximately 33% greater than the average level of 3.93 kWh/m2/day in a city with historically low levels (WA) and is approximately 21% less than the average level of 6.61 kWh/m2/day in a city with historically high levels (NV). [1]
→ Values listed as 0 (zero) are not available (N/A).
Solar Power: Belgrade vs. the U.S.
Below is a month-by-month comparison of how average Belgrade solar radiation levels compare to average levels in a city with historcially high levels (NV) and a city with historically low levels (WA). [1]
→ k/m/d = kWh/m2/day = kilowatt hours per square meter per day.
→ Values listed as 0 (zero) are not available (N/A).
We do not currently have data on solar panel installations in the village of Belgrade, NE at this current time.
Solar Power Output in Belgrade
The Power of Solar in Belgrade, NE
Monthly AC solar system output averages for Belgrade (ne). Month-by-month solar power, as ranked by AC output, in Belgrade. [2]
* Amounts listed in kWhac (kilowatt hours (AC))
Solar Output Analysis for Belgrade, NE
Belgrade (NE) has a average annual solar AC output value of 5990.81 kilowatt hours (AC). [2]
The month with the highest historical solar power output in Belgrade is July with an average of 593.5 kWhac, followed by June at 571.99 kWhac and August at 558.37 kWhac. [2]
The three months that historically average the lowest average solar output levels in Belgrade (Nebraska) are December with an average of 375.17 kWhac, followed by January with an average of 389.35 kWhac and November at 417.29 kWhac. [2]
Cost of Utilities in Belgrade
Belgrade Electricity Costs
Sorry, Belgrade residential electricity prices are currently unavailable.
Please check back later.
Solar Power Poll: Belgrade
Vote now: Given all of the data and analysis provided for Belgrade, is solar power a good choice for residents of this village?
Belgrade Natural Gas Costs
Sorry, Nebraska residential natural gas prices are currently unavailable.
The village of Belgrade, NE in Nance County has an approximate population of 126. [6]
Belgrade, NE Solar Energy
To learn more about solar energy and solar power Belgrade, NE, or for more solar-related resources for Belgrade, visit the U.S. Energy Information Administration.
Did you know?
It takes light about 8 minutes, 19 seconds to travel the 93,000,000 miles from the sun's surface to us on Earth.