The month of July has the highest historical solar radition values in Leland Grove with an average of 6.03 kWh/m2/day. [More]
Solar Panels in Leland Grove
Solar panels in Leland Grove that are tilted towards the equator at an angle equal to the latitude will produce the maximum solar energy output. [More]
Sunrise & Sunset in Leland Grove
The total length of the day in Leland Grove, IL today (November 14, 2024) will be 10 hours and 3 minutes. [More]
Solar Power in Leland Grove, IL
Solar Energy Data in Leland Grove, IL
See the chart below to see how different types of solar panel installations compare in Leland Grove.
Based on historical Leland Grove, IL data, solar panels that are tilted towards the equator at an angle equal to the latitude will produce the maximum solar energy output in Leland Grove.[1]
Leland Grove has an average monthly Global Horizontal Irradiance (GHI) of 4.14 kilowatt hours per square meter per day (kWh/m2/day), which is approximately 2% less than the average monthly Direct Normal Irradiance (DNI) of 4.24 kWh/m2/day. [1]
Solar installations in Leland Grove that are always titled at the latitude of Leland Grove (Average Tilt at Latitude or ATaL) average 4.8 kWh/m2/day, or about 16% greater than the average monthly GHI of 4.14 kWh/m2/day and approximately 13% greater than the average monthly DNI of 4.24 kWh/m2/day. [1]
Solar Energy Glossary
Global Horizontal Irradiance (GHI)
Global Horizontal Irradiance: The total amount of solar radiation that is received per unit area by a surface that is always positioned in a horizontal manner.
Direct Normal Irradiance (DNI)
Direct Normal Irradiance: The total amount of solar radiation received per unit area by a surface that is always perpendicular to the sun rays that come in a straight line from the direction of the sun at its current position in the sky.
Average Tilt at Latitude (ATaL)
Average Tilt at Latitude: The total amount of solar radiation received per unit area by a surface that is tilted toward the equator at an angle equal to the current latitude. ATaL will often produce the optimum energy output.
Solar Radiation Levels in Leland Grove
Solar Radiation Data in Leland Grove, IL
See the chart below for monthly solar radiation levels in Leland Grove.
* Amounts listed in kWh/m2/day (kilowatt hours per square meter per day)
Solar Radiation Analysis for Leland Grove, IL
Leland Grove, IL has a average annual solar radiation value of 4.99 kilowatt hours per square meter per day (kWh/m2/day). [1]
The month with the highest historical solar radition values in Leland Grove is July with an average of 6.03 kWh/m2/day, followed by August at 5.93 kWh/m2/day and September at 5.86 kWh/m2/day. [1]
The three months that historically average the lowest average solar radiation levels in Leland Grove (Illinois) are December with an average of 3.06 kWh/m2/day, followed by January with an average of 3.81 kWh/m2/day and November at 4.07 kWh/m2/day. [1]
Solar Power Comparison: Leland Grove vs. the U.S.
Solar Power Levels in Leland Grove
The average monthly solar radiation level in Leland Grove, IL, of 4.99 kilowatt hours per square meter per day (kWh/m2/day) is approximately 27% greater than the average level of 3.93 kWh/m2/day in a city with historically low levels (WA) and is approximately 25% less than the average level of 6.61 kWh/m2/day in a city with historically high levels (NV). [1]
→ Values listed as 0 (zero) are not available (N/A).
Solar Power: Leland Grove vs. the U.S.
Below is a month-by-month comparison of how average Leland Grove solar radiation levels compare to average levels in a city with historcially high levels (NV) and a city with historically low levels (WA). [1]
→ k/m/d = kWh/m2/day = kilowatt hours per square meter per day.
→ Values listed as 0 (zero) are not available (N/A).
We do not currently have data on solar panel installations in the city of Leland Grove, IL at this current time.
Solar Power Output in Leland Grove
The Power of Solar in Leland Grove, IL
Monthly AC solar system output averages for Leland Grove (il). Month-by-month solar power, as ranked by AC output, in Leland Grove. [2]
* Amounts listed in kWhac (kilowatt hours (AC))
Solar Output Analysis for Leland Grove, IL
Leland Grove (IL) has a average annual solar AC output value of 5695.49 kilowatt hours (AC). [2]
The month with the highest historical solar power output in Leland Grove is July with an average of 549.16 kWhac, followed by August at 548.23 kWhac and September at 526.89 kWhac. [2]
The three months that historically average the lowest average solar output levels in Leland Grove (Illinois) are December with an average of 319.92 kWhac, followed by January with an average of 398.38 kWhac and November at 400.81 kWhac. [2]
Cost of Utilities in Leland Grove
Leland Grove Electricity Costs
Sorry, Leland Grove residential electricity prices are currently unavailable.
Please check back later.
Solar Power Poll: Leland Grove
Vote now: Given all of the data and analysis provided for Leland Grove, is solar power a good choice for residents of this city?
Leland Grove Natural Gas Costs
Sorry, Illinois residential natural gas prices are currently unavailable.
The city of Leland Grove, IL in Sangamon County has an approximate population of 1,503. [6]
Leland Grove, IL Solar Energy
To learn more about solar energy and solar power Leland Grove, IL, or for more solar-related resources for Leland Grove, visit the U.S. Energy Information Administration.
Did you know?
The solar energy that strikes the Earth in one hour could provide all of the Earth's energy needs for a complete year.